Plan temporary support before demolition — Structural Beam Work and Support Replacement

Structural Beam Work and Support Replacement · 4 minutes · English · Continental Environmental Training
Key message: Loads can shift as soon as the first support is cut.

Why it matters

Loads can shift as soon as the first support is cut.

Work safely

• Install the designed temporary shoring and have it verified before removal.
• Control access to affected areas.
• Never rely on a worker to hold a loaded member.

Discuss with the crew

Where does this hazard exist on this job? What would make us stop, and who will correct it?

Check before starting and stop-work conditions

From a safe position, verify each action above against today's site, equipment or documents. Do not expose anyone just to demonstrate.

Stop work: Pause for missing controls, changed conditions or work beyond your training. Verify corrections before restarting.

Leader guide and source references

Source: 550 Small Business Toolbox Talks, T09-04, prepared October 19, 2026. Suggested session: 3-5 minutes including discussion and the site check. Read the hazard and actions aloud. A solo worker can answer aloud and record the check. Give instructions in language workers understand.

These introductory awareness talks do not replace hands-on training, employer programs, exposure assessments, manufacturer instructions, competent-person inspections, engineering designs, licensing, or certification. Apply the current requirements for the actual work, including stricter state or local rules. Attendance alone does not establish competence.

Before work, identify the exact address, emergency number, first-aid supplies, evacuation route, and who meets responders. In the United States call 911 for a life-threatening emergency. Do not improvise rescue into electrical, collapse, gas, or atmospheric hazards.

Reference starting points supplied in the PDF for this trade; these are not a claim that every listed reference directly covers every talk:

Residential construction and fall protection
https://www.osha.gov/residential-construction

Construction silica controls
https://www.osha.gov/silica-crystalline/construction

Electrical hazard awareness
https://www.osha.gov/electrical

Lead renovation repair and painting
https://www.epa.gov/lead/lead-renovation-repair-and-painting-program

Indoor and outdoor heat
https://www.osha.gov/heat-exposure

Show the crew

From a safe position, verify each action above against today's site, equipment or documents. Do not expose anyone just to demonstrate.

Ask the crew

  1. Where does this hazard exist on this job?
  2. What would make us stop, and who will correct it?

Sign-In Sheet — Plan temporary support before demolition — Structural Beam Work and Support Replacement

Date: ____________   Job site: ______________________   Presented by: ______________________

#Printed nameSignatureCompany
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20